If you have an under-used tennis court or an idle five-a-side pitch, you already hold what most padel investors spend months looking for: a prepared slab, existing fencing, lighting and a working facility. Conversion is faster and markedly cheaper than building from scratch. This article explains when it makes sense, which dimensions work and what to watch for.

How many padel courts fit on a tennis court?

With run-off areas, a standard tennis court occupies roughly 34–36 metres by 17–18 metres. A padel court is 20 × 10 metres. In practice that means two padel courts fit into the footprint of one tennis court, with the required spacing between them. The capacity difference is striking: a tennis court hosts two to four players at a time; two padel courts host eight in the same area.

Tennis courtTwo padel courts
Footprint~36 × 18 mSame area
Players at once2–48
Learning curveHigh, coaching neededLow, playable on day one
Forming groupsHard (similar levels required)Easy (mixed levels work)

Can a five-a-side pitch be converted?

Often more easily than a tennis court. A typical pitch runs 25–30 × 15–20 metres, which is comfortably enough for one padel court and in some cases two. The advantage is the existing perimeter fencing, lighting poles and electrical supply. The catch is the surface: a football pitch base is generally not suitable for padel, so the flatness and drainage of the slab underneath must be assessed separately.

Can the existing slab be reused?

This single question drives the cost of the conversion. A sound concrete platform, free of significant cracking and within level tolerance, can usually be reused; removing one of the heaviest cost items from the project. Asphalt is judged case by case on age and load capacity; a clay court needs a new platform. Three pieces of information settle it: the age of the concrete, the condition of the surface, and the difference in levels. Send those with a few photographs and we will tell you plainly whether conversion works.

Why is conversion faster than new build?

Because the slowest items are already done: the site, the permits, the power supply and usually the slab. What remains is production and installation. There is a commercial advantage too: the members are already there. You are offering a new sport to an existing community rather than building one from scratch, which normally means occupancy starts at a reasonable level from the first month. We break down the cost items here.

Send the dimensions, the surface type and a few photographs; we will confirm how many courts fit.

HAVE A PROJECT IN MIND?

We can build this project for you too.

QUOTE FORM

Tell us your project, your price ready in 24h.

We prepare exact pricing based on location, ground condition and number of courts.

Your details are used only to prepare your quote and are never shared.

CALL NOW